LiDAR stockpile accuracy: define the volume calculation
Assess LiDAR stockpile accuracy through coverage, reference data, base-surface assumptions and independent checks before relying on a reported volume.

LiDAR stockpile accuracy depends on the captured surface, reference information, boundary and base assumptions, processing and checks. Specify the quantity being reported and how uncertainty will be assessed. A detailed point cloud alone does not verify a stockpile volume or its material mass.
Define the calculation before capture
Agree which stockpile, boundary and date the report covers, and how the underlying base surface will be established. Identify areas that may be hidden from the planned capture positions. Record any changes during the capture window. The receiving team should understand how those conditions affect the calculation rather than receiving an unexplained volume figure.
Review assumptions and verification
Ask for the capture and processing method, reference information, check results and stated limitations. Repeat measurements require consistent definitions if they are to be compared. Converting volume to mass requires additional material information and its own assumptions; it should not be presented as a direct scanner measurement. Agree the required review and acceptance with the relevant survey or operational specialist.
What to include in your project brief
- Identify pile boundaries and capture date.
- Agree the base-surface evidence.
- Plan coverage of hidden surfaces.
- Specify calculation, checks and uncertainty reporting.
- Separate measured volume from any mass estimate.
Real Novo projects relevant to this guide
MAEPS provides a public Novo aerial/site-context example. It is not a stockpile measurement case, and no published Novo stockpile accuracy or volume result is asserted here.
MAEPS — Virtual Tour + Aerial 360° Content. Explore event spaces and site surroundings before planning a visit.
Questions before you commission
Does a point cloud verify the final volume?
It is input to a calculation. Coverage, boundaries, base-surface assumptions, processing and checks still need to be reviewed.
Can two volume reports be compared directly?
Check that they use consistent boundaries, reference information, base assumptions and methods, and account for changes between capture dates.
